Madsen completed the upgrade of speed control, sequencing, protection and load sharing of 6 11MW Sulzer engines at a power plant in Quebec. Each engine was refitted with Woodward electrical actuators and speed controls. Woodward EGCP-3s manage the sequencing, protection, load sharing and synchronization of each generator. The EGCP-3 also facilitates communication between all the engines and the plant power management system. Since this was an islanded prime power plant, work had to be done on a very tight schedule and without disrupting service.